Progressing ahead of plan - Main Track 1 (MT1) re-opened at Bay City / Bay Yard this evening. The project now allows better throughput and less interrupted production at Bay Yard. Main Track 2 (MT2) which was newly added with Atlas Code 83 Concrete ties should be finished later this week just prior to July 1st.
|
Y-BA04 led by GP38-2s 3816/3810 begins to cross from the "BAY1" DTC block into "CHE1" DTC block. The switch in between the DTC blocks will allow for better crossover and run-around moves. |
|
Another shot of Y-BA04 at the east main switch where the newly built MT2 diverges from MT1 at Bay Yard. |
No comments:
Post a Comment