Monday, December 3, 2012

Layout Update

My last update was on March 30, 2012 over 8 months ago. I do however have results to show regarding layout construction that has taken place during this time.

The biggest improvement completed over this time was the benchwork, mainline, and upper staging yard completion.
 The left side of the layout above taken from the room entrance shows the mainline banking into the super elevated curve heading toward Gray Lake, Gerhard, and Port Huron staging.





Right side of the layout from the room entrance showing the helix exit onto the upper deck leading through the Upper Huron Wye and over the Quanicassee Creek heading east. Soon a backdrop will hide the helix opening and the staging / through tracks along the back of the room by the poster.