Above the R-BAUH "Huron Turn" has just returned to Bay Yard after making a run to Upper Huron to drop off and pick up traffic for local delivery by the Upper Huron based switcher.
An inside look at the planning, construction, and operation of my 10x12 double deck HO scale model railroad set in current day Mid-Michigan.
Monday, December 3, 2012
Bay Yard - Fall 2012 Update
A quick update on Bay Yard - the final track plan has been developed for the yard and should be completed by early January 2013. The yard consists of 6 through tracks that can be used for classification, blocking, or arrival / departure
Above the R-BAUH "Huron Turn" has just returned to Bay Yard after making a run to Upper Huron to drop off and pick up traffic for local delivery by the Upper Huron based switcher.
The terminal also has a 2 track diesel service facility for inspecting, fueling, and making light repairs to motive power assigned to or moving through Bay City.
Above the R-BAUH "Huron Turn" has just returned to Bay Yard after making a run to Upper Huron to drop off and pick up traffic for local delivery by the Upper Huron based switcher.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment