An inside look at the planning, construction, and operation of my 10x12 double deck HO scale model railroad set in current day Mid-Michigan.
Wednesday, March 1, 2017
Wednesday, February 22, 2017
Wednesday, February 15, 2017
Thursday, February 9, 2017
Sunday, February 5, 2017
Early February Update
Time fly’s when you are having fun, or in this case while working on the layout. As discussed in early January I wanted to focus on working specific scenes one a time to make noticeable progress on the St. Clair Sub. The past few weeks have produced great results so let’s review the work completed and what’s on the workbench, and even checkout photos provided from the 2017 Amherst Show.
GRAYS LAKE - COOPERATIVE ELEVATOR
While developing the Town of Grays Lake I made sure that as work took place it was from backdrop to foreground. Helping provide a sense of the elevator, I took a few minutes to sketch out a rendering. Key items I wanted to include were the overhead conveyor bridges, and fall protection system. The facility will ship various grains and dry beans like the prototype Cooperative.
I wanted to capture 10' concrete form lines the best I could. Looking at alot of techniques I combined them to create a believable product. Using 3M 1.5" painters tape I tape from top to bottom. After each strip of tape I lightly traced a line using mechanical pencil. Then added the next strip of tape up to the top of the tower. For paint I used Humbrol Gray and Modelmaster Light Sea Gray in rattle cans. The base of the tower was already tan so the gray colors help dusted together helped create a nice effect. After spraying I then removed each strip to tape from top to bottom so each 1.5" strip on the tower was a little different. I let the paint setup until it was not tacky, then used the back edge of a no. 11 hobby knife to trace the line made with mechanical pencil. After this light "gouge" was completed I finished off with a alcohol / ink wash using a small brush along the form like and then pulling the wash straight down. Once dry you can apply more wash depending on your liking.
GRAYS LAKE - COOPERATIVE ELEVATOR
While developing the Town of Grays Lake I made sure that as work took place it was from backdrop to foreground. Helping provide a sense of the elevator, I took a few minutes to sketch out a rendering. Key items I wanted to include were the overhead conveyor bridges, and fall protection system. The facility will ship various grains and dry beans like the prototype Cooperative.
Cooperative Elevator and Crop Production Services @ Grays Lake, Michigan
I wanted to capture 10' concrete form lines the best I could. Looking at alot of techniques I combined them to create a believable product. Using 3M 1.5" painters tape I tape from top to bottom. After each strip of tape I lightly traced a line using mechanical pencil. Then added the next strip of tape up to the top of the tower. For paint I used Humbrol Gray and Modelmaster Light Sea Gray in rattle cans. The base of the tower was already tan so the gray colors help dusted together helped create a nice effect. After spraying I then removed each strip to tape from top to bottom so each 1.5" strip on the tower was a little different. I let the paint setup until it was not tacky, then used the back edge of a no. 11 hobby knife to trace the line made with mechanical pencil. After this light "gouge" was completed I finished off with a alcohol / ink wash using a small brush along the form like and then pulling the wash straight down. Once dry you can apply more wash depending on your liking.
Rendering of what Cooperative Elevator would look like
Fall Protection System Inspiration - Courtesy CAI Safety Systems
Closeup view of facility showcasing the fall protection system made using Plastruct components
Overall view of the four silos, conveyor bridge, and elevator tower
Closeup of elevator tower concrete form lines
This month I will finish tying the facility together, but everything you see with exception of the fall protection system is from Walthers kits.
- ADM Grain Elevator
- Conveyors
- Ladder with safety caged
- Grain Bin
GRAYS LAKE - CROP PRODUCTION SERVICES
A few years ago Blair Line released their Fertilizer Plant kit and I have always waited for the day I could add it as an industry. Just like the prototype in this part of Michigan's Thumb I found a compelling story that could be told with this kit. Never having built a laser wood kit before I was absolutely impressed with the directions, components, and sequence for assembly. The industry will sit on a three car spur on the same spur as Cooperative Elevator. Provided are a few photos of the build process over a week or so.
Follow the instructions provided with kit and Blair Line tip guide online - it is bullet proof
Primary walls in place, beginning to add doors, trim, and roof
Main structure completed, all that is left is loading conveyor
Completed structure test fitting at Grays Lake
GRAYS LAKE - DOWNTOWN & ROADS
The foreground portion of Grays Lake will be comprised of a Michigan Trunk Highway "M-XX" crossing the mainline and heading into town. We only see a small portion of the town, but the scene helps tell the story that we are entering the downtown business district. Currently the primary road layout has been completed. This month we will complete road markings using Summit USA road decals. Additionally grade crossing signals and street lamps have been acquired. As we work back to front these details will be added and showcased probably in the Early or Late March Update.
Test fitting the town structures
Cork installed as base layer - sidewalks are laser cut from Minuteman Scale Models
While the station is no longer rail served, it has become home to new business.
Laying road base (cork and adhesive) across tracks which parallel the Grays industrial spur
Sidewalks getting paint - primary styrene road painted and glossed awaiting decal markings
BLMA Rubber grade crossing installed in town. The road will but up flush to crossing panels once complete
AMHERST 2017 - The One Module Approach (T.O.M.A.) Layout
While I did not have the opportunity to attend this years Amherst show, a good friend of mind Mike Thidemann does attend. Mike was my eyes, ears, and shopping cart during the trip.Please enjoy photos of the new T.O.M.A. layout which we should be seeing more of soon. Thanks to Mike for the photos and picking up more Minuteman Scale Models sidewalk kits.
All photos are from left to right starting at staging yard and terminating at processing plant.
I am very excited to follow along on this T.O.M.A. series as it hosts modern techniques, well formatted scenes, contemporary industries, and contemporary railroading!
AMHERST 2017 - Mike McNamara's Modules
Could forget to show off a few photos of fellow model railroad blogger Mikes awesome Woodsville Terminal free-mo modules. For my photos of Mike's layout please follow the link to his blog on the right sidebar of this blogs homepage.
Alot of work complete in January setting up this month to be very successful as well. Over the next few weeks I will be adding the backdrop for Grays Lake, shaping and painting the foam to establish land contours, and mocking up the Altogas LPG Terminal. Where is the 3M plant? We will touch on the industry change up next month.
Have a great February!
GM
Labels:
Industry,
Inspiration,
Layout Update,
Structures,
Travels
Friday, January 6, 2017
2016 Recap / 2017 Plan
In my last post we discussed briefly reviewing the goals I had set for 2016. Well I took the time to go back to that first post of January and collect the goals I had set and we are now going to examine each to see where I landed. After discussing 2016 recap, we will walk through my 2016 state of the railroad and turn attention to setting goals for 2017.
2016 GOALS vs. ACTUAL
Goal: Create scenery
Actual: Completed scenery in “Farm Fields Curve” scene and refreshed “East Bay Yard” scene
Goal: Build structures:
Actual: Did not meet goal of building structures, however did acquire more built buildings for scenes
Goal: Quarterly Ops Sessions
Actual: January 2016, June 2016, October 2016 A, October 2016 B
Goal: Host layout in FWLOD
Actual: Hosted two sessions during DFW Interchange Ops weekend, next FWLOD should be 2017
Goal: 4 to 5 Locomotive sound installs
Actual: 11 sound installs complete (8 contract / 3 MCIS)
** Bonus **
Actual: Partnered with Azatrax LLC. to plan, install, showcase, and operate a ABS system with 8 blocks and sixteen signal heads between East Bay City and East Staging in less than five months.
ABS signals guarding the transition between EBAY and EDSE blocks east of Bay City.
Overall I met 4 of 5 goals for 2016 and I am very proud of the accomplishments made and assistance from family and friends along the way.
MCIS 3816 idles in Bay Yard awaiting its next assignment
STATE OF THE RAILROAD 2016
Ops Sessions
This year we hosted four operating sessions with 18 total operators attending. Of these sessions one was part of the NMRA Lone Star Region Convention and the last two were part of the DFW Interchange weekend. Over these four sessions, 52 trains were operated with 624 total car movements.
Railcar Fleet
Active railcar fleet stands at 190 cars (30 cars added, 6 removed for net gain of 24 cars in 2016). I do not see any big changes with the fleet in the next year as the current car mix accurately captures the overhead and local traffic that is common on the St. Clair Sub.
Locomotive Fleet
Total fleet stands at 67 motors (63 on active roster and 4 stored). Of 67, 29 are actually modelled of which 20 are active.
Two rebuilt SD40M-2s (former SD45-2) and one GP38-2 were returned to service this December with Soundtraxx Tsunami2 and Tsunami sound decoders. Upon activation and assignment, our mechanical team will review the proposed retirement of the nine oldest GP38-2s which lower their total number for 25 to 16. Of the oldest nine GP38-2s three are modelled with two on the dead line.
MAC Shop Contract Work
This year Michigan Interstate’s Mt. Pleasant, Michigan MAC “Motivepower & Car” began outside contract decoder install work. This year saw work completed for three different customers culminating in eight sound decoder installs. Overall the MAC shop completed installation of eleven sound decoder systems in 2016.
Customer Franchise
Looking at the customer base, we had three traffic additions on the St. Clair Sub this year. Starting with Michigan Sugar at Upper Huron we converted a portion of the 4000 cubic open top hoppers from coal to hauling sugar beets during the campaign August thru November converting this short haul move away from trucks. In between beet seasons the cars will find use in aggregate service with a large demand planned for 2017. Additionally two customer facilities were added this year with first being Graystone Cement at Bay City. This facility is a water to rail distribution terminal for cement products moving to the Ohio Valley, Mid-Atlantic, and eastern Canadian regions. Secondly Crop Production Services opened a fertilizer facility at Grays Lake to support Michigan’s fertile Thumb region.
Engineering / Infrastructure
Trackwork complete in 2016 on the St. Clair Sub consisted of adding run around tracks at Grays Lake and Bay City to better support local service to customers. The largest task handled by our engineering team was the addition of an operational Automatic Block Signal System between Bay City and Port Huron. The modelled portion consists of eight detection blocks driving 16 signal heads installed between June and October in partnership with Azatrax LLC of Longmont, CO. The new system was first used operationally and operated flawlessly during the DFW Interchange session on October 29thwhich consisted of two sessions lasting 6.5 hours handling 25 trains. Be sure to check the blog to walk through the different phases of install. Operating the ABS system alongside Direct Traffic Control dispatching provides an extra layer of safety while being cost effective for Class II regional system.
Social Media
Keeping current the Michigan Interstate St. Clair Subdivision is on the worldwide web with its own blog showcasing monthly updates, layout how-to installs, and other musings in the prototype and model railroading industry. In addition we also have a YouTube Channel showcasing some of the previous operating events, signal system operation, and links to other great channels. This year we reached over 55,600 views with our highest month to date viewership in July at 4,022 views. While we do not have our own page on Facebook we do share in multiple groups the happenings around the St. Clair Sub (Model Rail Radio, Freelance Model Railroads, and Model Railroad Operations). The goal of the blog is to reach, inspire, and showcase the great opportunities within the hobby.
Scene Development
Closing out the year, two scenes are largely completed with exception for small details. On the lower level the “East Bay” Scene (Bay Yard East Lead Switch to Helix entrance) was refreshed and completed during the ABS system install. The upper level scene completion consisted of “Corn / Bean Fields” (M-29 Overpass to Gerhard).
Making the most of planning, the layout has been divided into twelve scenic sections. By dividing the layout into these scenes I can better plan and allocate resources and materials to make progress. Too often we as modelers get pulled to work on many scenes at once that either do not get completed in a timely manner or rack up a lot of costs. My hope is focusing on one area before moving to the next will net finished scene results. Originally I had planned to complete one upper and one lower level, but best to finish work above before moving to lower deck.
Ops Sessions
One session per quarter to include hosting during 2017 Fort Worth Layout Operations Day
Railcar Fleet
Continue with fleet weathering – planned 20 cars. Acquire cars from Scale Trains and Springs Mills Depot.
Locomotive Fleet
No locomotive acquisitions planned / Activate (2) SD60Ms, (1) GP40-2 and upgrade (2) GP40-2s
MAC Shop Work
Support MCIS planned installs and any contract work sourced
Customer Franchise
Michigan Agricultural Commodities will be begin operating unit train service from their Bay City Terminal for export at Hunter’s Bay, VA. Additionally large MDOT projects have already placed a large demand for aggregates in 2017 which will require unit train service of aggregates off the Port Belle Branch.
Engineering / Infrastructure
Dump ballast at Grays Lake and continue installing Caboose Industries ground throws
Social Media
Early and Late Month Update Blog Posts, Posting update links to Facebook groups.
Scene Development
One session per quarter to include hosting during 2017 Fort Worth Layout Operations Day
Railcar Fleet
Continue with fleet weathering – planned 20 cars. Acquire cars from Scale Trains and Springs Mills Depot.
Locomotive Fleet
No locomotive acquisitions planned / Activate (2) SD60Ms, (1) GP40-2 and upgrade (2) GP40-2s
MAC Shop Work
Support MCIS planned installs and any contract work sourced
Customer Franchise
Michigan Agricultural Commodities will be begin operating unit train service from their Bay City Terminal for export at Hunter’s Bay, VA. Additionally large MDOT projects have already placed a large demand for aggregates in 2017 which will require unit train service of aggregates off the Port Belle Branch.
Engineering / Infrastructure
Dump ballast at Grays Lake and continue installing Caboose Industries ground throws
Social Media
Early and Late Month Update Blog Posts, Posting update links to Facebook groups.
Scene Development
Complete scenery, trackwork, and structures in “Grays Lake” scene
Shoving platform 31 returning to Bay City on rear of L-PBBA-02 "Sugar Turn"
So here's to 2017 and what we hope it will bring the Michigan Interstate. I hope the best for everyone, your families, and your model railroading hobby!
GM
**(Photos shown were my best of the year similar to what you would see in a stockholder packet)**
Monday, January 2, 2017
Early January Update
It is amazing at how fast the Holiday Season goes by. Seems like yesterday was Thanksgiving and now are here in 2017! Since my last post the St. Clair Sub has seen different types of activity. One great point of our hobby is variety. For example I do not feeling like working on scenery, so I can instead install a decoder, assemble a building, or just run trains. Lets take a look at happenings from the back end of December.
Christmas Acquisitions
I have to give my family credit, they do a great job staying in tune to what I like. It also helps when online retailers like Walthers and Mountain Subdivision Hobbies have wishlists that you can create and folks then reference. At any rate I was very fortunate to receive great model train gifts for Christmas
Christmas Acquisitions
I have to give my family credit, they do a great job staying in tune to what I like. It also helps when online retailers like Walthers and Mountain Subdivision Hobbies have wishlists that you can create and folks then reference. At any rate I was very fortunate to receive great model train gifts for Christmas
From the wife and kids: Blair Line Fertilizer Supply Kit, 2017 Walthers Catalog, and resale DPM buildings from Ebay.
Labels:
GP38-2,
L.H.T.,
Motive Power,
Product Review,
Railmaster,
SD40M-2,
Sound Install,
Soundtraxx,
Weathering
Subscribe to:
Posts (Atom)










