Finished all primary trackwork at Buhler as planned, hope to install the industry sidings and blue point controllers tomorrow.
Gotta love flowing trackwork - looking west from atop backdrop wall. The Elevator Facility in town will be a fictional terminal for "Cooperative Elevator" who has numerous facilities in Michigan's thumb.
Track level looking west.
View looking east towards staging "Gerhard and beyond to Port Huron"
Sweeping curve heading west towards Grays Lake. Tracks left to right: "one track aka. Setout / pickup", passing siding which was the old main, and the mainline now consisting of concrete ties.
No comments:
Post a Comment